~
~
+effective_date+
1.
RESIDENTIAL
A.
Electric – No sales tax on residential electric
accounts.
|
$25.48 service
charge per month in addition to power used.
|
|
All Kilowatt Hours -----------------------
|
$
+residential_electric_kilowatt_hours+ per Kilowatt hour
|
B.
Water
|
Water Inside City Limits: (inside city sales tax 9.75%)
|
|
1st
1,500 gallons-------------------------
|
$13.50
(minimum)
|
|
Next 50,000 gallons---------------------
|
$
5.44 per 1,000 gallons
|
|
Over 50,000 gallons---------------------
|
$ 5.13 per 1,000 gallons
|
|
|
|
Water Outside City Limits: (outside city sales tax 9.25%)
|
|
1st
1,500 gallons-------------------------
|
$20.25
(minimum)
|
|
Next 50,000 gallons---------------------
|
$
8.15 per 1,000 gallons
|
|
Over 50,000 gallons---------------------
|
$ 7.71 per 1,000 gallons
|
C.
Sewer
|
Sewer Inside City Limits: (no sales tax on sewer)
|
|
1st
1,500 gallons-------------------------
|
$14.50
(minimum)
|
|
Next 50,000 gallons---------------------
|
$
5.84 per 1,000 gallons
|
|
Over 50,000 gallons---------------------
|
$ 5.52 per 1,000 gallons
|
|
|
|
Sewer Outside City Limits: (no sales tax on sewer)
|
|
1st
1,500 gallons-------------------------
|
$21.75
(minimum)
|
|
Next 50,000 gallons---------------------
|
$
8.76 per 1,000 gallons
|
|
Over 50,000 gallons---------------------
|
$ 8.28 per 1,000 gallons
|
Sewer
usage is based on the metered water usage.
|
D.
Natural
Gas
No sales tax on
residential
gas accounts.
|
General Gas Rate
|
|
|
|
Minimum Bill
|
$ 7.00 (no gas included)
|
|
|
All 100 cu. ft.
|
$ +residential_natural_gas_general+ per 100 cu. ft.
|
|
School Rate
|
|
|
|
Minimum Bill
|
$ 7.00 (no gas included)
|
|
|
All 100 cu. ft.
|
$ +residential_natural_gas_school+ per 100 cu. ft.
|
|
Industrial Rate
|
|
|
|
Minimum Bill
|
$ 7.00 (no gas included)
|
|
|
0 to 10,000 CCF
|
$ +residential_natural_gas_level1+ per CCF
|
|
|
10,001 to 30,000 CCF
|
$ +residential_natural_gas_level2+ per CCF
|
|
|
30,001 to 999,999 CCF
|
$ +residential_natural_gas_level3+ per CCF
|
|
|
|
|
2.
COMMERCIAL
PART 1
A.
|
Electric
–
(Less than 50 KW demand) – 7.0% sales tax added to all commercial and/or
industrial electric
accounts.
|
|
$27.02
service charge per month in addition to power used. (single phase)
|
|
$36.43
service charge per
month in addition to power used. (three phase)
|
|
All
Kilowatt Hours -----------------------
|
$+commercial_electric_kilowatt_hours+
per Kilowatt hour
|
|
|
|
B.
|
Water, Sewer, & Natural
Gas – 9.25% sales tax on
water outside
city limits and 9.75% sales tax inside city limits, no sales tax on sewer, 7.0% sales
tax on all commercial and/or industrial natural gas accounts.
|
|
These
rates are equal to
residential rates as listed above.
|
3.
Other
Charges
A.
|
Water,
Sewer, & Natural Gas Tap Fee
|
|
|
INSIDE CITY
|
OUTSIDE CITY
|
|
¾ “ - 1" Water Tap
--------------
|
$1000.00
|
$1,350.00
|
|
Larger than 1“ Water
Tap ----
|
$1,500.00
plus
actual cost
|
$1,500.00 plus actual
cost
|
|
|
|
|
|
4" Sewer Tap
--------------------
|
$900.00
|
Not Available
|
|
FORCE MAIN TAP
------------
|
$1,400.00
|
Not Available
|
|
6-8" Sewer Tap
-----------------
|
$1,500.00
|
Not Available
|
|
|
Natural Gas Tap
----------------
|
$300.00 for the 1st 100 feet, after that it will be
an additional $1 per foot. Road boring fees $150.00, if needed
|
|
|
|
|
B.
|
Outdoor
Lighting Rental
|
|
BASE RATE
|
$ +other_outdoor_lighting_base+
|
|
|
|
73 watt LED
-----------
|
27 Kwh
|
+
|
$6.87 =
|
$ +other_73_watt_led+
|
|
176 watt LED
-----------
|
64 Kwh
|
+
|
$11.24 =
|
$ +other_176_watt_led+
|
|
145 watt LED
-----------
|
53 Kwh
|
+
|
$9.29 =
|
$ +other_145_watt_led+
|
|
254 watt LED
-----------
|
93 Kwh
|
+
|
$13.77 =
|
$ +other_254_watt_led+
|
|
150 watt Metal
Halide
-----------
|
68 Kwh
|
+
|
$4.49 =
|
$ +other_150_watt_mh+
|
|
400
watt Metal
Halide
----------
|
164 Kwh
|
+
|
$6.79 =
|
$ +other_400_watt_mh+ |
|
1000 watt Metal
Halide
---------
|
394 Kwh
|
+
|
$12.15 =
|
$ +other_1000_watt_mh+ |
|
175
watt
Mercury Vapor
---------
|
77 Kwh
|
+
|
$3.26 =
|
$ +other_175_watt_mv+
|
|
400 watt Mercury
Vapor
---------
|
174 Kwh
|
+
|
$4.21 =
|
$ +other_400_watt_mv+ |
|
1000 watt Mercury
Vapor
-------
|
399 Kwh
|
+
|
$8.98 =
|
$ +other_1000_watt_mv+
|
|
100 watt High
Pressure
Sodium
|
45 Kwh
|
+
|
$4.75 =
|
$ +other_100_watt_hps |
|
250 watt High
Pressure
Sodium
|
111 Kwh
|
+
|
$5.32 =
|
$ +other_250_watt_hps+ |
|
400 watt High
Pressure
Sodium
|
171 Kwh
|
+
|
$7.25 =
|
$ +other_400_watt_hps+ |
|
|
|
|
|
|
|